Construction of the building for washing the mining machinery on industrial site of LLC «Eristovskij GOK», Poltavskij region, Komsomol`sk
LLC «Eristovskij GOK»
2011-2012
Bored piles – 294 m3, monolithic concrete 890 m3, metal framework from SIN-beams – 145 tonnes, extra strong floors – 1725 m2.
Gallery of the project